© 2025 VideoMan | Contact / Contact: info@videoman.gr | Privacy Policy | Terms Of Use
Students of materials science at the University of Penn State in the US Pennsylvania, built bridges using macaroni and melt. To test the strength of the design of the bridge, placed a bucket in each bridge and measured quantities of sand were poured in the bucket at 10 second intervals. The winning design was the most highest bridge load weight versus weight (weight of sand).